Home improvement and neighborhood repair
Most work in Georgetown is improvement rather than new construction, since the neighborhoods filled in over the last few decades. A Georgetown roof replacement, addition or pool install takes one standard unit at the driveway end, typically for six to ten weeks.
Streets in Georgetown are curving with short drives and cars parked close, so placement gets settled at drop time. We keep the Georgetown unit off the sidewalk and out of the turning radius a neighbor needs to back out. Because a Georgetown block often has three or four projects running at once, we note which driveway belongs to which job on the ticket.
Schools, fields and community events
Schools and ball fields anchor the Georgetown calendar, with meets, camps and tournaments running most of the year. A Georgetown school order takes standard units along a fence line, an ADA accessible unit on pavement and a handwashing station at the concession trailer.
Weekend tournaments in Georgetown are dropped Friday and collected Monday, since we work Monday through Saturday and close Sunday. That schedule keeps a service truck out of the Georgetown lot while families are still arriving.
Pine flats, drainage and summer storms
Under the Georgetown streets is old pine flatwoods, sand over hardpan with drainage ditches running between the blocks. A Georgetown unit set near a ditch bank leans within a week, so placement goes on a driveway, a parking lot or a compacted pad.
Afternoon storms flood the Georgetown swales in under an hour and leave the ground soft for days afterward. We keep Georgetown placements reachable from hard surface, which turns a wet-week service into an ordinary stop. A Georgetown ditch that runs full on Tuesday is usually still soft by the weekend, which is why placement never goes on turf.
